From Fedora Project Wiki

The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

This page tracks the budget for the FUDCon:Tempe 2011 event.

Robyn Bergeron has created a more up to date spreadsheet here.

Estimates

Key: FE = Fedora Engineering; CA = Community Architecture. Hotel costs are expressed as $600 for 3 nights, double occupancy. So for every 2 people, it's a $600 cost.

Estimated cost
! Item FE Q2 CA Q2 FE Q3 CA Q3 FE Q4 CA Q4
Facilities
UTO (tech support) overtime (Sun) $ 750
MemU rooms and equipment (Mon) $ 500
Printing and materials (badges, etc.) $ 500
Food, drink, hospitality
Coffee/danish for 150 (Sat) $ 750
Coffee/danish for 150 (Sun) $ 750
FUDPub food & space (Sat) (space: $700) $4,000
Swag $1,500
Blue Disposable Earplugs - 200 count $25
Travel
3@ Airfare from Fedora Eng $1,000
12@ Hotel from Fedora Eng $2,150
4@ Airfare from Fedora Eng $1,200
4@ Airfare from Fedora Eng $1,200
Travel subsidies, airfares and hotel
(these need to be broken out by quarter)
$8,500
Hack/hosp. suite (Fri-Sun) $ 700
TOTALS $1,000 $0 $1,200 $3,200 $6,150 $12,175

Running total: $23,725. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.

Important note: This really doesn't raise the budget for FUDCon to >$25K. Because the Fedora Engineering team is using standard travel budget in Q2 and Q3, along with a set-aside in Q4, and since Community Architecture spreads some of its costs around too, we can conserve against the standard $20K allotment.

Other resources

Here's a Google spreadsheet where we're tallying subsidies, just for good measure.