From Fedora Project Wiki

Line 18: Line 18:
| Deposit for hotel block ||  || $1,000 ||  ||  ||  ||
| Deposit for hotel block ||  || $1,000 ||  ||  ||  ||
|-
|-
| Printing and materials (badges, etc.) ||  ||  ||  || $  500 ||
| Printing and materials (badges, etc.) ||  ||  ||  || $  500 ||  ||
|-
|-
! colspan=7 | Food, drink, hospitality
! colspan=7 | Food, drink, hospitality
Line 48: Line 48:


Running total: ''$25,325''. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.
Running total: ''$25,325''. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.
'''Important note:''' This really doesn't raise the budget for FUDCon to >$25K.  Because the Fedora Engineering team is using standard travel budget in Q2 and Q3, along with a set-aside in Q4, and since Community Architecture spreads some of its costs around too, we can conserve against the standard $20K allotment.

Revision as of 11:59, 18 August 2010

This page tracks the budget for the FUDCon:Tempe 2011 event.

Estimates

Key: FE = Fedora Engineering; CA = Community Architecture. Hotel costs are expressed as $600 for 3 nights, double occupancy. So for every 2 people, it's a $600 cost.

Estimated cost
! Item FE Q2 CA Q2 FE Q3 CA Q3 FE Q4 CA Q4
Facilities
UTO (tech support) overtime (Sun) $ 750
MemU rooms and equipment (Mon) $ 500
Deposit for hotel block $1,000
Printing and materials (badges, etc.) $ 500
Food, drink, hospitality
Coffee/danish for 150 (Sat) $1,500
Coffee/danish for 150 (Sun) $1,500
FUDPub food & space (Sat) $4,000
Swag $1,500
Blue Disposable Earplugs - 200 count $25
Travel
3@ Airfare from Fedora Eng $1,000
12@ Hotel from Fedora Eng $2,150
4@ Airfare from Fedora Eng $1,200
4@ Airfare from Fedora Eng $1,200
Travel subsidies, airfares and hotel $8,500
TOTALS $1,000 $1,000 $1,200 $3,200 $6,150 $12,775

Running total: $25,325. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.

Important note: This really doesn't raise the budget for FUDCon to >$25K. Because the Fedora Engineering team is using standard travel budget in Q2 and Q3, along with a set-aside in Q4, and since Community Architecture spreads some of its costs around too, we can conserve against the standard $20K allotment.