= Introduction =
= Introduction =


The purpose of this document is to present a set of rules that determine whether a package update is considered '''PASSED''' (i.e. it is ready to be committed to repository), '''FAILED''' (i.e. the build should be discarded and a fix should be requested) or '''NEEDS_INSPECTION''' (i.e. similar to FAILED at the moment, but it becomes PASSED if all errors are waived).
The purpose of this document is to present a set of rules that determine whether a package update is considered '''ACCEPTED''' (i.e. it is ready to be committed to repository), '''REJECTED''' (i.e. the build should be discarded and a fix should be requested) or '''NEEDS_INSPECTION''' (i.e. similar to REJECTED at the moment, but it becomes ACCEPTED if all errors are waived).


= Test Strategy =
= Test Strategy =
Line 30: Line 30:
= Test Pass/Fail Criteria =
= Test Pass/Fail Criteria =


All mandatory tests must pass. If some of mandatory tests fail, the testing stops and the package update is considered '''FAILED'''.
All mandatory tests must pass. If some of mandatory tests fail, the testing stops and the package update is considered '''REJECTED'''.


All introspection tests must pass. If an introspection test fails, other tests continue to be executed. If some of introspection tests fail, the package is considered '''NEEDS_INSPECTION'''. An [[#Responsibilities_and_permissions|eligible person]] may inspect errors of an failed introspection test and waive them.
All introspection tests must pass. If an introspection test fails, other tests continue to be executed. If some of introspection tests fail, the package is considered '''NEEDS_INSPECTION'''. An [[#Responsibilities_and_permissions|eligible person]] may inspect errors of an failed introspection test and waive them.


The package update is considered '''PASSED''' if there are no failed mandatory tests and all failed introspection tests are waived.
The package update is considered '''ACCEPTED''' if there are no failed mandatory tests and all failed introspection tests are waived.


The results of advisory tests have no impact on package update validity.
The results of advisory tests have no impact on package update validity.


''Do all advisory tests must be completed before we mark package as PASSED? In order to avoid a situation where package is marked as PASSED but we still can't inspect all the advisory tests' output.''
''Do all advisory tests must be completed before we mark package as ACCEPTED? In order to avoid a situation where package is marked as ACCEPTED but we still can't inspect all the advisory tests' output.''


= Test Deliverables =
= Test Deliverables =


* A decision if a particular package update has PASSED, FAILED or NEEDS_INSPECTION
* A decision if a particular package update has been ACCEPTED, REJECTED or NEEDS_INSPECTION
* A full log of individual test cases' output containing infos, errors or warnings
* A full log of individual test cases' output containing infos, errors or warnings
* A special output marked as informative from any test case that passed but wants to convey additional information
* A special output marked as informative from any test case that passed but wants to convey additional information
Line 89: Line 89:
* It is the responsibility of the waiver to ensure that he/she waives only false errors, not real problems.
* It is the responsibility of the waiver to ensure that he/she waives only false errors, not real problems.


* When all introspection tests failures are waived, the state change from NEEDS_INSPECTION to PASSED is to be handled automatically by Quality Assurance team tools.
* When all introspection tests failures are waived, the state change from NEEDS_INSPECTION to ACCEPTED is to be handled automatically by Quality Assurance team tools.


* Groups of people that are allowed to waive errors may also re-execute the test plan on a particular package.
* Groups of people that are allowed to waive errors may also re-execute the test plan on a particular package.

Revision as of 12:02, 5 March 2010

Warning.png
This page is a draft only
It is still under construction and content may change. Do not rely on the information on this page.
Note.png
Use discussion
Don't forget to check discussion page.

Revision history

2010-02-11 kparal - First draft

Introduction

The purpose of this document is to present a set of rules that determine whether a package update is considered ACCEPTED (i.e. it is ready to be committed to repository), REJECTED (i.e. the build should be discarded and a fix should be requested) or NEEDS_INSPECTION (i.e. similar to REJECTED at the moment, but it becomes ACCEPTED if all errors are waived).

Test Strategy

The test plan is divided into three main sections:

  1. Mandatory tests
  2. Introspection tests
  3. Advisory tests

Test Priority

Mandatory tests are executed as the first ones, in arbitrary order. After all mandatory tests have been executed and passed, the introspection and advisory tests are executed in arbitrary order.

Do we really need to have the strict requirement that introspection and advisory tests are executed only after mandatory tests have completed?

Scope

This test plan contains only tests that can be automated, i.e. executed without human intervention. No manual tests will be performed. (But this does not reject human intervention when inspecting the test results, like waiving false errors.)

Test Pass/Fail Criteria

All mandatory tests must pass. If some of mandatory tests fail, the testing stops and the package update is considered REJECTED.

All introspection tests must pass. If an introspection test fails, other tests continue to be executed. If some of introspection tests fail, the package is considered NEEDS_INSPECTION. An eligible person may inspect errors of an failed introspection test and waive them.

The package update is considered ACCEPTED if there are no failed mandatory tests and all failed introspection tests are waived.

The results of advisory tests have no impact on package update validity.

Do all advisory tests must be completed before we mark package as ACCEPTED? In order to avoid a situation where package is marked as ACCEPTED but we still can't inspect all the advisory tests' output.

Test Deliverables

  • A decision if a particular package update has been ACCEPTED, REJECTED or NEEDS_INSPECTION
  • A full log of individual test cases' output containing infos, errors or warnings
  • A special output marked as informative from any test case that passed but wants to convey additional information
  • Any test scripts used for automation or verification

Test Cases

Note: More tests are going to be added in the future (init-scripts test, manpage test, desktop-file test, etc).

Mandatory tests

  • Test package sanity - must be installable, uninstallable, upgradeable, etc
  • Repo sanity - the update must not break dependencies of other packages
  • Conflicts - there must be no file/package conflicts
  • Upgrade path - the update must not break upgrade path

Introspection tests

  • Rpmlint - no errors present, warnings count is under certain threshold

Advisory tests

  • Rpmlint - no warnings present
  • Rpmguard - no warnings present

Can we move some rpmguard checks into introspection tests?

Test Environment

  • AutoQA (the automated test execution framework) must be packaged and deployed in Fedora infrastructure. It will be used for test execution.
  • Test cases will be executed on all hardware platforms relevant for that particular package build. The only exception being test cases which can be executed in a platform-neutral way.
  • For those test cases, for which it makes sense, their execution should be done in a software environment as close as is feasible to that which will exist after the package is pushed to 'updates' repository. Generally this will be with a system that is up to date from 'fedora' and 'updates' repositories, but does not contain other packages from 'updates-testing' repository (except for the dependencies or other packages built from the affected source package - they should be updated in generally installed).

Responsibilities and permissions

  • It is the responsibility of the waiver to ensure that he/she waives only false errors, not real problems.
  • When all introspection tests failures are waived, the state change from NEEDS_INSPECTION to ACCEPTED is to be handled automatically by Quality Assurance team tools.
  • Groups of people that are allowed to waive errors may also re-execute the test plan on a particular package.

Schedule

This test plan is executed on every package update build and on all new packages builds.

Risks

  • If AutoQA needed for automated testing is not available (outage, crash) and test plan execution is not possible, the package updates may be stalled, automatically refused or automatically accepted, depending on Quality Assurance team decision.

Reviewers

References