Fedora Innovation Lifecycle
This proposal outlines an alternative structured process for large entities to introduce, develop, and potentially integrate experimental features, components, outputs, processes, or services within the Fedora Project that are too large or complicated to be realized as part of a single Change Proposal process.
Objectives
- Foster Innovation: Encourage contributors to bring forward new ideas, technologies, and features that may be too immature for direct inclusion in a standard Fedora release.
- Isolate Risk: Provide controlled environments and outputs where experimental changes can be tested, broken, and fixed without affecting the main distribution branches or the experience of general Fedora users and contributors.
- Gather Early Feedback: Facilitate early community and stakeholder engagement to gather feedback, identify potential issues, and guide the development of the experimental concepts that are intended and desirable to be fully integration with the project.
- Establish a Path to Integration: Define clear criteria and a structured transition path for successful Innovation projects to move toward becoming official Fedora features, services, or outputs.
- Promote Transparency: Ensure all experimental work is visible and accessible to the broader Fedora community
- Attract New Contributors: Make a place where innovation and experimentation are encouraged.
Background/Why
Fedora is a large project with many moving parts. It’s becoming increasingly difficult for new ideas that are not materially connected to existing components to grow within the project. In addition, our infrastructure is complex, and the release train is precise. Many people depend on releases to go smoothly. Adding in new infrastructure, deeply integrated components, new editions or spins to this release train takes serious effort. We lack a clear process for new ideas to grow and join our project smoothly since integration takes so much time, and we need a way to implement our ratified strategic direction that is fair and impartial. We need to ensure these new ideas can be sustainably managed without placing an unfair burden on any one person or group of people.
As larger entities wish to contribute significant time and ideas to Fedora, we risk the real possibility that the community is no longer heard. All of these possible ideas that would fit inside this Innovation Lifecycle would bring change to Fedora in some capacity, whether that’s a change in trademark, a change in technology, or a change in perception. These ideas need to be managed to ensure we maintain our culture, ideals, and community-driven direction in a transparent manner.
Why not Change Proposals? While the Change Proposal process is suitable for a series of small changes, it can be difficult to use for large changes or a series of interlocking changes that need to be made together.
Why not rawhide? Rawhide is useful for coordinating updates to integrated components for Fedora Linux releases. It’s not well suited for experimentation concerning changes in how components interlate or changes to the build infrastructure itself.
Criteria
There are three main criteria for an innovative idea’s progression through the Lifecycle stages:
- Technical maturity, or how well can this project scale within Fedora while delivering enterprise-grade production value to the community
- Market fit, or how well does this project fill a need in the Fedora or overall Linux community
- Community engagement, or how well can this project bring and integrate contributors and end users, either new or existing, to Fedora’s community
An idea’s placement within the stages depends on how well the team driving it forward meets or exceeds these three criteria. A team bringing the idea forward may still be new to all three criteria at the start of the proposal process, but Council’s job is to use the proposal to evaluate whether they have the capacity to grow into meeting or exceeding all three. This activity will require engaging explicitly with both FESCo and Mindshare on evaluations, and leaning on the Council representatives from those committees (and others that may gain representation in Council in the future) to surface concerns during the pre-vote evaluations.
Structure
The Innovation Lifecycle will consist of 3 primary stages:
- Sandbox
- Curation
- Integration
Each stage will have explicit contracts agreed to as part of stage entry, which establish a timeframe with explicit review criteria to help ensure that sufficient progress is being made towards full integration. Projects that do not make agreed-upon sufficient progress will exit the Innovation Lifecycle pathway via alternative exits or archival (“off-ramps”). The community has input periods throughout the lifecycle to ensure that all voices can be heard in alignment with our culture.
Sandbox
Sandbox projects are Innovation projects that make strategic sense to include within the Fedora community, but may not yet be ready for working within Fedora infrastructure or for release as a deeply integrated shared component. These projects must be substantially different than something that exists within Fedora, must not be something that could fit within a single release cycle (and thus possibly a ChangeProcess cycle), and must have some form of team of contributors that can work with the Fedora community to deliver the project at least into the Curation stage.
Examples of past projects that might have been Sandbox projects had we the Innovation Lifecycle when they were introduced:
- Atomic Desktops
- RISC-V bring up
Entry
Before beginning the formal process, we encourage teams with a Sandbox proposal to begin an informal community discussion through Discussions and/or mailing lists before filing the formal entry ticket. Ways to start this informal discussion include
- opening a general thread in Fedora Discussions tagged with the relevant Innovation Idea tag (TBD);
- engaging with relevant SIGs, if any, by bringing your proposal to their meetings and asking for feedback or co-signing;
- asking FESCo members for technical feedback; and
- asking Mindshare members for their marketing and advocacy feedback.
This practice ensures the community is not blindsided by your proposal. The pre-proposal discussion is a great time for more knowledgeable members of the community to point the proposers to individual SMEs and SIGs who they think would be interested in providing feedback on the proposal. Council is charged with doing the same work as part of the formal proposal and may request the proposal team to pause the formal proposal process before the formal discussion period begins, and help foster useful connections with other community members who might be interested in helping make the proposal stronger with relevant feedback.
Sandbox entry requires project teams to open a Council ticket with a draft Sandbox entry proposal and a supplemental requirements document that includes community feedback from the informal discussion concerning agreed-on requirements that must be met to reach full integration status. This ticket will start a formalized 2-week community feedback period where the Fedora community is able to review the proposal and provide constructive feedback. The project team can revise the Sandbox entry proposal as they see fit, incorporating the community feedback before Council takes up the proposal for a Sandbox admittance vote. The requirements document is primarily a tool by which Fedora leadership encodes requirements that the team must meet in order to fully integrate with the project. For Council to grant conditional approval, the proposal team must affirm that they feel they can meet the requirements added by Council.
At the close of the 2-week period, Council will conduct a Sandbox entry evaluation at the first available Council meeting or via an asynchronous process. After evaluation, there will be a Council vote. This voting process may take up to 2 weeks depending on how long evaluation takes and how many projects are waiting for evaluation.
Evaluation
It is expected that Sandbox entry proposals will have unique considerations, but all Sandbox entry proposals need to provide the following information for Council consideration:
- What is the overall strategic vision for the full integration of this technology into Fedora?
- What are the key benefits of using the Innovation Lifecycle process versus the normal ChangeProposal process?
- Who are the primary users of the innovative technology: end-users, existing Fedora contributors, upstream ecosystem, downstream ecosystem, other?
- Which existing Fedora Project SIGs or teams are identified stakeholders and will be participating?
- What are the known policy deviations in the Sandbox stage that will need to be reconciled in the Curation stage?
- Is there a viable fallback pathway for this technology if full integration into the Fedora project isn't achieved? (Ex: Remix hosted by Fedora, downstream adoption)
- What non-standard resources does this project need, and how are they being resourced during the Sandbox stage?
- What is the expected contributor ladder during the Sandbox stage?
- What are the metrics by which you will measure progress towards technical maturity, market fit, and community engagement?
- What is the requested Sandbox review timeframe?
- What are the sufficient progress conditions demonstrable via the agreed-on metrics?
- Who are the Sandbox stage committed team members for the requested timeframe and what are their core competencies as it relates to the 3 primary review criteria pillars: technical maturity, market fit, and community engagement?
Council will make a Sandbox admittance decision based primarily on strategic fit for the Fedora Project, overall Fedora project capacity (so that there are not too many such projects in-flight), and an assessment of the ability of the Sandbox team to provide the agreed-on metrics and requirements in the review timeframe to make it possible to do a progress review required to successfully continue on in the lifecycle process.
Council is explicitly not evaluating the Sandbox entry proposal for technical viability. Once Council provides conditional approval, Council will instruct proposers to open tickets with FESCo and Mindshare for requirements refinement suitable for their respective subject authority. If the refinement process stalls, the proposers can escalate back to Council which will trigger a Fedora leadership conversation. Once requirement refinement reaches a conclusion, the proposers must affirm they feel confident they have the resources necessary to address all the requirements asked of from the Fedora leadership.
Council will then do a final review and evaluate if the progress criteria the team has chosen for Sandbox exit are reasonable given the final agreed on requirements. These progress criteria will be used as a starting point for working with FESCo and other stakeholders in the Curation stage.
Trademarks
Inclusion into the Sandbox stage explicitly confers a time-limited use of the Fedora trademarks during participation in Sandbox and Curation stages. On exit from the lifecycle via an alternative pathway, it is expected that the technology team will need to transition to standard Fedora Remix branding guidance, unless Council grants continued trademark use under its authority via a separate trademark usage proposal request.
Review
Sandbox Review will be initiated by the Sandbox project team via a Council ticket no later than 2 weeks after the agreed-on review target date. This ticket will start a 2-week formalized community discussion period similar to the Sandbox entry ticket. The Review ticket will include a progress review that addresses the agreed-on review criteria set forth in the Sandbox entry and will request one of the agreed-on progress actions set forth in the Sandbox entry proposal. The default set of progress actions will consist of:
- Sandbox exit (“off-ramp”)
- Sandbox renewal
- Curation stage entry
Exit
If Sandbox exit is requested, other community members will have a chance to stand up and make the case for transitioning this technology into a more traditional ChangeProposal process as part of the Sandbox exit, before any specialized integrations or Fedora infrastructure supporting the Sandbox project are spun down. It is expected that any Fedora infrastructure specialized resources made available for the Sandbox stage will be spun down within the timeframe of a normal release cycle unless there is a transitional ChangeProposal under consideration. Once Fedora Council agrees to the Sandbox exit request, the technology team driving the Sandbox engagement should begin to transition to their fallback pathway (possibly outside of the Fedora Project infrastructure.)
Renewal
If Sandbox renewal is requested, the ticket should also include an updated Sandbox entry proposal with updated information, including target progress criteria and other changes. The community feedback period will be treated similarly to the Sandbox entry proposal, with the additional context of the previous Sandbox cycle to aid in assessment.
Curation Entry
If Curation stage entry is requested, the ticket needs to include a Curation entry proposal and will outline deficiencies that need to be addressed during the Curation stage.
Curation
Curation projects are Innovation projects that have reached significant progress to start thinking of them in terms of a series of ChangeProposals that can be integrated during the next available release via normal means.
Projects that reach curation stage may still have requirements unfulfilled but they far enough along where its reasonable for the project team to fashion ChangeProposals, with assistance, that FESCo can talk through with a focus on integration details.
Curation implies a serious intent from all parties to reach fully integrated status.
Entry
Curation stage entry will require a proposal that details known deficiencies that must be addressed prior to full integration. The Curation stage entry requires interaction with additional Fedora Project stakeholders to begin the work of fully integrating the technology according to the communicated strategic vision. If Council approves the request for Curation entry, the first action is to identify a technical Curation lead and a Council executive sponsor. These individuals will work to interact with other stakeholder groups, which includes at a minimum FESCO, Fedora infrastructure, and Fedora Mindshare, to address deficiencies with regard to Fedora project policy reconciliation, infrastructure integration, and community governance with the goal of having a series of ChangeProposals that FESCo can consider.
Review
The formal Curation stage review by Council will happen approximately on Fedora release cycle boundaries to determine if progress is being made to addressing the deficiencies and whether the project is on track to being completed within an 18-month time frame. If at the 12-month review point it's clear that deficiency reconciliation isn’t possible, the project can begin its journey towards its alternative exit path and live on outside of the Fedora Project if one has been identified.
Integration
Integration projects are Innovation projects that have successfully fully integrated with the Fedora Project using the ChangeProposal process to integrate all proposed changes.
Entry
Entry into the Integration stage will be by a formal ChangeProposal that signifies that all deficiencies identified at the start of the curation stage have been mitigated to the satisfaction of the relevant Fedora Project stakeholders. Fedora Leadership stakeholders may choose to require that the Fedora Council engage in a sustainability review on a specified timeframe. Such a request would need to identify key sustainability metrics to incorporate in the review.
Sustainability Review
The purpose of the sustainability review is to catch strategic projects that stumble with regard to longer term sustainability aspects and place them back into a curation stage as a way to potentially rehabilitate them by giving them some focused attention. Or if that’s not possible, provide a graceful adjournment so the project can refocus resources on other sustainable efforts.
Standard Sandbox Infrastructure
There is no standard sandbox infrastructure as part of this initial policy proposal. I will be talking more with the CLE team concerning transitioning the communishift and forge infra as the basis of a standard sandbox offering that will help make this pathway more compelling to community project ideas.
